« Design of a Museum for Experimental Architecture.
Scenario :
1) The courtyard of the Frac is smeared and glass sticks aggregated in order to generate a gluing, a smearing of the existing building as a potential of a Body Without Organ (a going to be done and unachieved process of construction) and inside the thickness of the glass a labyrinthine walk way and accessibilities. A scattering script is written to develop the aggregation.
2) Procedures of construction and cleaning are assisted by robots (with or without automatism) to introduce randomization and uncertainty in the final shape and to be able to re-program the labyrinth during the construction itself
3) The glass elements are issued from a citizen glass recycling process in order to reduce the raw material costs and involve the inhabitants of the agglomeration in the work to be done story.
4) The construction schedule is planned on more than 10 years for the same reason construction became a factor of desire with a desirable machine (Marcel Duchamp).
5) Using individual RIFD-PAD to force visitors to accept to loose themselves in the glass maze and redefine their XYZ positioning according to the specificities of an exhibition (PAD with sound, video and local GPS). »
New-Territories (S/he)